09.03.2022
Conversion Cityport Zurich
With new energy-efficient fans, energy consumption is significantly reduced. Thanks to the new modern humidification system, water and energy are saved. In addition, the new system complies with the hygiene directive SWKI VA104-01.
- Number of air handling units: 5
- Total air volume flow 150'000 m3/h
- Conversion date 2021 to 2022 (in stages)
Delivery content Seven-Air Gebr. Meyer AG
Components:
- Supply air-exhaust air-Fan Wall with 2 free-wheeling fans EC each
- Flex collar
- Hybrid humidifier incl. evaporation unit and pump station
- Conversion trough with drain, rear wall and ceiling (W-No. 1.401)
- LED lighting
- Unit casing 7Air in ORION blue
Work performance:
- Dismantling and disposal of droplet separator, complete contact humidifier, lighting, housing fans incl. motors, flex sleeve, old housing parts.
- Provision of the necessary installations for the conversion (lifting gear, platforms, tools, etc.) Installation of the fans and the humidification system
- Provision of a conversion team (4 persons)
- Functional check and commissioning
Old casing fan is removed and replaced with two fans with EC motors (IE5).